feat(ptica): ВРИ row in Градостроительство (real ЕГРН) #1862

Merged
bot-backend merged 1 commit from fix/ptica-vri-row into main 2026-06-20 23:09:42 +00:00
Collaborator

Prototype's ГРАДОСТРОИТЕЛЬСТВО card leads with a ВРИ row; prod lacked it. Added from real egrn.permitted_use_text («многоквартирные дома»), honest «нет данных ЕГРН» fallback. Verified on local render — wraps cleanly in the narrow card, no overflow. tsc/lint/build ok.

🤖 Generated with Claude Code

Prototype's ГРАДОСТРОИТЕЛЬСТВО card leads with a ВРИ row; prod lacked it. Added from real `egrn.permitted_use_text` («многоквартирные дома»), honest «нет данных ЕГРН» fallback. Verified on local render — wraps cleanly in the narrow card, no overflow. tsc/lint/build ok. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
bot-backend added 1 commit 2026-06-20 23:09:40 +00:00
feat(ptica): add ВРИ row to Градостроительство (real ЕГРН permitted_use)
All checks were successful
CI / changes (pull_request) Successful in 7s
CI / backend-tests (pull_request) Has been skipped
CI / frontend-tests (pull_request) Successful in 1m4s
CI / openapi-codegen-check (pull_request) Successful in 2m4s
28b853bcdf
Prototype's first ГРАДОСТРОИТЕЛЬСТВО row is ВРИ — prod lacked it. Add it from
the real egrn.permitted_use_text (e.g. «многоквартирные дома»); honest «нет
данных ЕГРН» fallback. Value wraps cleanly in the narrow card (verified, no
overflow).
bot-backend merged commit 4f90334ffd into main 2026-06-20 23:09:42 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: lekss361/gendesign#1862
No description provided.